Rössing Uranium Mine, Arandis 6387 Supply and Installation of 3 km specialist drainage piping, 1 km perforated HDPE pipes, sumps and appurtenances …

Rössing Uranium Mine, Arandis 6375 Replacement of acid contaminated soil with soilcrete backfill. Construction of new acid proof V-Drain paving. New pipe …

Rössing Uranium Mine, Arandis 6421 Extensive concrete and rebar repair to existing columns and slab during planned maintenance shut. CLIENT: CNNC Rössing …

Husab Uranium Mine, Arandis 6379 The work involved the planning and execution of specialist concrete grout pumping repair work during the 7 …

Walvis Bay 6320 The work involves the construction of a multistorey cooling structure, several tank farms and associated pipe reticulation buildings. CLIENT: …

Arandis Town 6127 The work involved the repainting of the Husab Mine access road markings to SANRAL road standards. CLIENT: Swakop Uranium …

Rössing Uranium Mine, Arandis 6356 The work involved the construction of a temporary gland seal concrete tank base and associated concrete bunded …

Windhoek 6314 Ablecon was tasked to renovate several memorial grave headstones, as well as refurbishment of the memorial site for the CWGC. …